Linear Guide (IKO) Replacement – Fusion Pro 32 & 48

How do I replace the linear guide in the Fusion Pro 32 and 48?

Introduction

This guide covers replacing the IKO linear guide on the x-axis of the Fusion Pro 32 and 48. The x-axis assembly is removed from the engraver to replace the rail, then the x-axis belt is re-tensioned using the motor’s RMS current reading.

Parts Required

  • CS1205 – Linear Guide, 988mm (Fusion Pro 32)
  • CS0489 – Linear Guide, 1394mm (Fusion Pro 48)

Tools Required

  • 5/32", 7/64" and 3/32" Allen Wrenches
  • 5/16" Nut Driver
  • Phillips Screwdriver

Safety First: Ensure the engraver is completely powered off and the power cord is disconnected before removing any panels or touching internal components.


IKO Removal

Step 1

Turn Off Engraver

Turn off the engraver.

Step 2

Disconnect from Power

Unplug the engraver from its power source.

Step 3

Remove Side Panels

Remove the left and right panels of the engraver by loosening the 5/32" cam locks.

Step 4

Center the X-Axis Assembly

Manually move the x-axis assembly to the middle of the engraver.

Step 5

Loosen Lens Tube Collar

Loosen the Phillips screw on the lens tube retaining collar (circled in red). Hold the lens tube so it does not fall.

Step 6

Remove Lens Tube

Remove the lens tube.

Step 7

Remove Bellows

Remove the left and right bellows and the backing plate by loosening the six 5/16" nuts.

Step 8

Loosen Drive Board Cover Screws

Loosen, but do not remove, the four Phillips screws that hold the x-axis drive board cover (circled in red).

Step 9

Remove Drive Board Cover

Remove the x-axis drive board cover.

Step 10

Disconnect Drive Board Connectors

Disconnect the seven electrical connectors from the x-axis drive board (red arrows).

Step 11

Disconnect Air Tubing

Disconnect the air tubing from the elbow connector on the right side of the x-axis assembly (highlighted in purple).

Note: The air tubing is held by a retaining fixture. Press the tubing into the fixture, then hold the orange retaining ring against the fixture and pull the tubing away from it.

Step 12

Remove Drive Board Housing Screws

Loosen and remove the four 7/64" hex screws that hold the x-axis drive board housing (circled in red).

Step 13

Remove Drive Board Housing

Remove the x-axis drive board housing.

Step 14

Remove X-Axis Fasteners

Remove or loosen the four 5/32" fasteners that secure the x-axis assembly to the y-axis bearings: two on the right side (top) and two on the left side (bottom).

Step 15

Lift the X-Axis Assembly

Lift the x-axis assembly up to clear the locator pins on the left and right y-axis bearing blocks.

Step 16

Remove the X-Axis Assembly

Slide the x-axis assembly out of the engraver through the right side.

Step 17

Loosen Idler Mounting Screws

Loosen, but do not remove, the eight 7/64" idler mounting screws on the left side of the x-axis assembly (circled in red).

Step 18

Release Belt Tension

Remove the tension from the x-axis belt by loosening the two 7/64" screws on the idler assembly body (circled in red).

Step 19

Remove Lens Carriage Screws

Remove the four 3/32" Allen screws that secure the lens carriage assembly to the x-axis assembly (circled in red).

Step 20

Remove Lens Carriage

Gently rock the carriage assembly back and forth to unseat it from the retaining pin, then remove it from the x-axis assembly.

Step 21

Release the Belt Clamps

Loosen and remove the four 3/32" x-axis belt clamp Allen screws (circled in red). Pull both ends of the x-axis belt away from the x-axis assembly.

Step 22

Remove Access Port Cover

Loosen and remove the two Phillips screws and remove the access port cover on the bottom-right side of the x-axis assembly.

Step 23

Remove Right-Side Rail Screws

Starting at the right side of the x-axis assembly, remove the 3/32" Allen screws that secure the IKO rail to the x-axis assembly.

Step 24

Move the Slider Block

Once the screws on the right side of the linear guide are out, move the slider block on the linear guide to the right side of the x-axis assembly so it rests over the access port.

Step 25

Remove Remaining Screws and Bump Stops

Remove the remaining 3/32" Allen screws and the two plastic bump stops, if present (highlighted in purple). Let the linear guide rest on the bottom of the x-axis assembly.

Step 26

Remove the IKO Rail

Remove the IKO rail from the x-axis assembly.


Linear Guide Installation

Step 27

Position the New Rail

Position the new IKO rail in the x-axis assembly: CS1205 for the Fusion Pro 32 or CS0489 for the Fusion Pro 48.

Note: The linear guide is not directional and can be installed in either orientation.

Step 28

Install a Few Rail Screws

Install three to five 3/32" Allen screws in the IKO rail to hold it in place.

Step 29

Install Bump Stops

Install the two plastic bump stops on the IKO rail, securing each with one of the 3/32" IKO rail screws.

Step 30

Install Remaining Rail Screws

Install the remaining 3/32" IKO rail screws to secure the rail to the x-axis assembly.

Step 31

Install Lens Carriage

Position the lens carriage assembly on the x-axis assembly. Install and tighten the four 3/32" Allen screws.

Step 32

Install Belt Clamps

Place the x-axis belt clamps inside the x-axis assembly. Install and tighten the four 3/32" Allen screws.


X-Axis Assembly Installation

Step 33

Install the X-Axis Assembly

Slide the x-axis assembly into the engraver through the right side of the machine.

Step 34

Seat on the Bearing Blocks

Place the x-axis assembly on the y-axis bearing blocks, making sure the locator pins go into the upper bearing block assembly.

Step 35

Install X-Axis Fasteners

Install or tighten the four 5/32" fasteners that secure the x-axis assembly to the y-axis bearings: two on the right side and two on the left side.

Step 36

Position Drive Board Housing

Position the x-axis drive board housing over its mounting holes.

Step 37

Install Drive Board Housing Screws

Install and tighten the four 7/64" hex screws that hold the x-axis drive board housing.

Step 38

Reconnect Air Tubing

Reconnect the air tubing to the elbow fitting on the right side of the x-axis assembly.

Note: Insert the tubing into the collar of the retaining fixture, then gently pull on it to make sure it is secure.

Step 39

Reconnect Drive Board Connectors

Reconnect the seven electrical connectors to the x-axis drive board.

Note: Each connector on the drive board is unique and only fits one receptacle.

Step 40

Install Drive Board Cover

Install the x-axis drive board cover and tighten the four Phillips screws.

Step 41

Install Bellows

Install the backing plate and bellows. Install and tighten the six 5/16" nuts that hold them in place.

Step 42

Install Lens Tube

Install the lens tube and tighten the Phillips screw on the lens tube retaining collar.


Tensioning the X-Axis Belt

Step 43

Tension the X-Axis Belt

Apply tension to the x-axis belt with the two 7/64" belt tensioning screws (circled in red) until the excess slack is removed.

Step 44

Power On

Reconnect the engraver to power and turn it on.

Step 45

Create a Test Box

In your preferred illustration program, create a black raster box on the artboard that is:

  • Fusion Pro 48: 46" (1100 mm) wide
  • Fusion Pro 32: 30" (800 mm) wide
  • Roughly 4" (100 mm) tall

Step 46

Print the Job

Print to the Epilog Software Suite or Epilog driver with these settings:

  • Speed: 100
  • Power: 0

Note: Power does not matter here, as the engraver runs with the lid open for this procedure.

Step 47

Start the Job

Send the job to the engraver and start it.

Step 48

Open the Settings Menu

On the display, press the gear icon in the upper right corner to open the Settings menu.

Step 49

Open Advanced Settings

Press and hold the word Settings on the display to open the Advanced Settings menu.

Step 50

Find the X-Axis RMS Current

Open the Diagnostics menu and find the RMS Current reading for the X-Axis motor/drive.

Step 51

Adjust to 5.2 – 6.2 A

While the job runs, the x-axis motor RMS current should be between 5.2 and 6.2 A.

  • If the current is lower, increase belt tension by tightening the two 7/64" tensioner screws on the x-axis idler assembly.
  • If the current is higher, decrease belt tension by loosening the two 7/64" tensioner screws.

Note: If the current cannot be brought above the lower limit, the belt may need to be trimmed: remove two teeth with aviation or metal snips and repeat the tensioning. If it cannot be brought below the upper limit, other mechanical issues may be affecting the lens carriage travel. Check the x-axis belt clamp placement and the x-axis reducer belt tension, and look for physical obstructions or wear points.

Step 52

Check Engraving Quality

The RMS current range is a guideline, not the only reference for belt tension. Once the current is in range, engrave a line of capital "T"s in Times New Roman and inspect the serifs:

  • Good tension: the serifs are well defined.
  • Loose belt: the serifs look doubled or skewed.
  • Tight belt: the engraver may be noisier than usual and show error messages.

Step 53

Check Belt Tracking

With the belt tensioned, check that the x-axis belt stays as centered as possible on the idler pulley while in motion.

Step 54

Center the Belt

If the belt rides against the idler pulley flange, make equal but opposite adjustments to the two 7/64" tensioner screws. Repeat until the belt stays centered on the pulley in motion.

  • Belt too high: tighten the top screw 1/4 turn and loosen the bottom screw 1/4 turn.
  • Belt too low: loosen the top screw 1/4 turn and tighten the bottom screw 1/4 turn.

Step 55

Tighten Idler Mounting Screws

Once the belt is centered and the RMS current is in range, tighten the eight 7/64" idler mounting screws on the left side of the x-axis assembly.

Step 56

Install Side Panels

Install the left and right panels of the engraver.