Fiber Laser Conversion – IPG to JPT

Inleiding

This guide covers the removal of the IPG laser out of the Fusion M2 and the subsequent installation of the JPT laser.

Safety First: Ensure the machine is completely powered off and disconnected from the power cable before starting.

Fiber Handling Warning: Be extremely careful when handling the yellow fiber cable. Do not kink or severely bend the fiber cable as it will cause permanent damage.


Removal of IPG out of the Fusion M2

Disconnecting power cord
Stap 1

Power Off Machine

Zet de machine uit en haal de stekker uit het stopcontact.

Removing lower back panel
Stap 2

Verwijder het achterpaneel

Remove the lower back panel.

Disconnecting fiber power and signal
Stap 3

Disconnect Power & Signal

Disconnect the fiber power and signal cable.

Note: The signal cable on the right unscrews from the fiber source. The power cable on the left must be followed to its connection point and disconnected there.

Removing laser screws
Stap 4

Remove Laser Screws

Remove the four screws securing the laser. There are two green captive phillips screws and two hex screws.

Removing left side panel
Stap 5

Remove Left Side Panels

Remove both the upper and lower left-side panels.

Loosening fiber head bracket screws
Stap 6

Loosen Bracket Screws

Loosen the four screws securing the fiber head bracket.

Feeding fiber head out of chassis
Stap 7

Remove Fiber Head

Feed the fiber head out of the machine through the cutouts in the chassis. Be careful not to kink or bend the fiber cable.


Installation of JPT

Now that the IPG is removed, proceed with the installation of the JPT laser.

Installing adapter bracket
Stap 8

Install Adapter Bracket

Install the fiber adapter bracket with the screws provided.

Attaching fiber supply
Stap 9

Attach Fiber Supply

Attach the fiber supply to the bracket using the provided 9/64 hex wrench and hardware.

Feeding fiber head through cutouts
Stap 10

Route Fiber Head

Feed the fiber head back up through the cutouts.

Securing fiber head and extension tube
Stap 11

Secure Fiber Head

Insert the fiber head extension tube and fiber head into the bracket and secure the bracket.

Reconnecting signal and power cables
Stap 12

Reconnect Cables

Reconnect the signal and power cables.

Attaching grounding cable
Stap 13

Attach Grounding Cable

Attach the additional yellow grounding cable to the chassis in the unused hole next to the fiber supply.

Final Verification & Alignment

Before replacing the panels, follow the alignment guide, attached on the right, to ensure the fiber laser is properly aligned. Once complete, reattach all machine panels.

Was dit nuttig?

Ja
Nee
Bedankt voor je feedback!
  • ID:
    01711
  • Datum:
    08/06/2026

Gereedschap:

  • 9/64" Zeskantsleutel
  • 5/32" Zeskantsleutel
  • Kruiskopschroevendraaier

Ga verder met je laseravontuur

Bekijk een oude les nog eens of ga verder om te zien wat er daarna komt!